- Location: London, WC1
- Client: MACE Ltd
- Contract Duration: 26 weeks
SERVICES PROVIDED:
- Provision of external 650 20/32 Passenger Goods hoist
- Provision of internal M1500 Goods Only hoist
Lyndon SGB have provided an internal M1500 Goods Only hoist and an external 650 20/32 Passenger Goods hoist to this new build office development between High Holborn and Lincoln Inns Field. The external hoist services 8 levels with a top landing height of 31 metres whilst the internal hoist services 2 basement levels to a total depth of 6 metres. The external hoist incorporates a large “C” gate to facilitate easier loading of large items from the loading bay area. The total hire period for this project is 26 weeks.
- Location: London, WC1
- Client: MACE Ltd
- Contract Duration: 26 weeks
SERVICES PROVIDED:
- Provision of external 650 20/32 Passenger Goods hoist
- Provision of internal M1500 Goods Only hoist
Lyndon SGB have provided an internal M1500 Goods Only hoist and an external 650 20/32 Passenger Goods hoist to this new build office development between High Holborn and Lincoln Inns Field. The external hoist services 8 levels with a top landing height of 31 metres whilst the internal hoist services 2 basement levels to a total depth of 6 metres. The external hoist incorporates a large “C” gate to facilitate easier loading of large items from the loading bay area. The total hire period for this project is 26 weeks.